This Uruguay steel warehouse project showcases Hengon’s ability to deliver highly customized and engineering-driven solutions. The client’s professional engineering team worked closely with us to optimize the design, including adjusting the 7m column spacing, upgrading purlin specifications, and adding stainless-steel mesh to the ventilation skylight based on their past operational experience. We also customized 12 decorative front columns, provided high-quality lifting sectional doors, and supplied dock levelers after strict supplier audits. Through detailed coordination and a fully verified supply chain, Hengon ensured a cost-efficient, durable, and installation-friendly steel structure warehouse solution tailored to the client’s long-term needs.
| Project Cases | |||||
| Country | Uruguay | Year | 2024 | ||
| Project Information | |||||
| Project | Logistics Center | Dimension | 70.2mx34mx9m | Wind speed | 31m/s |
| Material | H-steel | Paint | Alkyd paint | Purline | C purline |
| Roofing and wall | V950 50mm PIR sandwich panel | Door | Electricity motorized sectional door | ||
| Project Pictures | |||||
| |||||